Case study

Sunkosi Spithurst Road

Barcombe, BN8 5EF

Ollie and Sarah have lived at Sunkosi since 2009. In 2012 they undertook full cavity wall and loft insulation and draught proofed all doors, windows and the loft hatch via the CERT scheme, which Ovesco arranged for many Barcombe properties. This year they had an air source heat pump and new radiators, TRVs and thermostat installed. A wood burner supplies supplementary heat when required. Their annexe is fully insulated and double glazed, with full electric heating. They next plan to install solar panels.

Archetype 1976 – 1995
Built 1985
Residents Five (3 adults, 2 children)
Type Detached (2009 annex)
Owner Ollie and Sarah Pendered
Features ASHP
Cavity wall insulation
Double glazing
Draught proofing
EV charge point
Oil footprint Running costs £1,390 pa
ASHP footprint

Potential 2021
3,478 kg pa

Potential 2030
670 kg pa

Running costs £871 pa

EPC rating EPC rating n/a

Pin It on Pinterest

Share This