Case study

3 Gladstone Buildings

High Street, Barcombe, BN8 5 AX

When Bex moved in last year, her house survey showed that her new home was badly insulated so she undertook a programme of insulation. This included the roof of the main house, the roof of the rear extension, interior wall insulation and insulating under the suspended timber floor on the ground floor. The existing sash windows had secondary glazing fitted. Once this programme of works was done, Bex replaced the night storage heaters with a new air source heat pump, radiators suitably sized for a heat pump and a new hot water cylinder. She was able to claim the Renewable Heat Incentive towards the cost of the heat pump.
Archetype Pre 1930’s
Built 1880 (est)
Residents Three (1 adult, 2 children)
Type Mid – Terrace
Owner Bex Washington
Features ASHP Extensive insulation (wall, floor, roof) Secondary glazing
Oil footprint Running costs £n/a
ASHP footprint

Potential 2021
2,880 kg pa

 

Potential 2030
583 kg pa

Running costs £893 pa

EPC rating EPC rating B (est)